This original 1960’s bathroom was in desperate need of a complete makeover. Construction started with the entire bathroom being striped back to the concrete floor in August 2018, new plumbing and electrical layout was installed and the entire bathroom finished within 10 weeks. The bathroom was completely redesigned to maximise the space, underfloor heating was installed, together with bespoke wall hung timber vanity and eye height storage with mirrored doors. The space is now not only functional but provides a luxurious very modern space our clients love.